Case: TCE Spread Hedge Error

A hedge built on WS-level intuition underperformed because route-level cost assumptions diverged from realized execution.

Key Takeaways

  • TCE normalization is mandatory for cross-route hedging.
  • Model assumptions need ongoing calibration against fixtures.
  • Execution quality materially affects hedge outcomes.

References

Last reviewed: 2026-03-21