Case: Demurrage Cost Overrun

Port delays extended loading time beyond contractual allowances, reducing realized profitability on a nominally positive trade.

Key Takeaways

  • Execution assumptions must be stress-tested for congestion risk.
  • Demurrage sensitivity is a core risk metric in physical books.
  • Operational monitoring can preserve trading edge.

References

Last reviewed: 2026-03-21